At handover
Know the backed-up circuits, monitoring and normal operation before you need them.
Your handover checklist
- Identify backed-up circuits and loads to leave off.
- Review normal operation, monitoring and battery reserve settings.
- Understand the agreed generator connection and operating procedure, if included.
- Receive equipment information, documented scope and a support contact.
Use the manufacturer’s operating instructions. Electrical enclosures and connections belong to qualified personnel.